January 22, 2026
The new hall is specifically designed for assembling energy‑efficient product ranges from the Portable Air division, such as E-Air, B-Air, and dryers. In addition, the expansion creates space to further broaden the product offering. New product categories such as mobile dryers and nitrogen generators will also be accommodated here.
A modern hall focused on technology, safety, and ergonomics
The new hall not only provides additional capacity for assembly and material handling but is also equipped with the most advanced technologies such as electronic tools, AI vision and AGVs (automatic guided vehicles).
Production teams can rely on ergonomically designed workstations, modern tools, and a safe, pleasant working environment.
Next phase: optimization of logistics flows
In the next phase, the current front building will make way for an entirely new logistics hall, directly connected to the assembly lines. This expansion will further streamline logistical material flows, reduce waiting times, and increase the overall efficiency of the site.